Description of Services
Consulting assistance

Oracle GoldenGate for Big Data (GGBD)

In order to use GoldenGate in a Golden Gate Hub Configuration

Assistance with creating additional Oracle GoldenGate for Big Data processes needed:

  •  Manager
  •  Extract
  •  Replicat
  • Assistance with architecture design of GGBD implementation with existing client Hub architecture
  • Evaluation of existing environment, produce readiness document of any outstanding issues to prerequisite to implementation
  • Develop prerequisite checklist to address prior to implementation
  • Identification of Java components and all configuration/parameter files
  • Assistance/Review of data movement plan
  • Assistance with sample GGBD parameter files
  • Assistance with test / development setup in existing Hub environment
  • Assistance and identification/documentation  of components, files, parameters necessary  for setup of GGBD
  • Assistance with installation of GGBD and associated processes through the GG CLI
  • Assistance with any conflict detection and resolution
  • Assistance and documentation of resiliency recipe
  • Assistance with functional testing / implementation
  • Setup of monitoring for GGBD
    •  Monitoring extracts to the point of transfer
    • Configuration of new replications
  • Assistance/documentation with and for GoldenGate troubleshooting for GGBD

Assumptions

  • Design should be consistent with the Maximum Availability Architecture
  • All processes detailed above will be documented in detail, with examples that have been tested.

https://docs.oracle.com/en/middleware/goldengate/big-data/12.3.2.1/gbdin/understanding-java-adapter-and-oracle-goldengate-big-data.html#GUID-EDFEF2A7-ADBA-4B1A-87F1-AEFD2061AE9D

Oracle Big Data 12.3.2.1

Ready for Action?

LET'S GO!
Copyright 2024 IT Remote dot com
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram