Description of Services
Consulting assistance
Oracle GoldenGate for Big Data (GGBD)
In order to use GoldenGate in a Golden Gate Hub Configuration
Assistance with creating additional Oracle GoldenGate for Big Data processes needed:
- Assistance with architecture design of GGBD implementation with existing client Hub architecture
- Evaluation of existing environment, produce readiness document of any outstanding issues to prerequisite to implementation
- Develop prerequisite checklist to address prior to implementation
- Identification of Java components and all configuration/parameter files
- Assistance/Review of data movement plan
- Assistance with sample GGBD parameter files
- Assistance with test / development setup in existing Hub environment
- Assistance and identification/documentation of components, files, parameters necessary for setup of GGBD
- Assistance with installation of GGBD and associated processes through the GG CLI
- Assistance with any conflict detection and resolution
- Assistance and documentation of resiliency recipe
- Assistance with functional testing / implementation
- Setup of monitoring for GGBD
- Monitoring extracts to the point of transfer
- Configuration of new replications
- Assistance/documentation with and for GoldenGate troubleshooting for GGBD
Assumptions
- Design should be consistent with the Maximum Availability Architecture
- All processes detailed above will be documented in detail, with examples that have been tested.
https://docs.oracle.com/en/middleware/goldengate/big-data/12.3.2.1/gbdin/understanding-java-adapter-and-oracle-goldengate-big-data.html#GUID-EDFEF2A7-ADBA-4B1A-87F1-AEFD2061AE9D
Oracle Big Data 12.3.2.1