Architect - Paul Girardeau (770) 639-0200        / paul.girardeau@abri-ds.com

Contractor - John Plasky (678) 640-8273 cell  /  lc_construction@hotmail.com

Michael & Suzanna Culp (864) 250-0419            /  mike.culp@gmail.com

Address: 755 Hammett Bridge Rd., Greer, South Carolina 29650 / Suite 150

The initial set of plans submitted for review

2018-92.01 AE PERMIT.pdf

Initial Plans Link (Click Here) (25 pages)

  • Cover Sheet                                                           Page 1
  • Appendix B                                                             Page 2
  • Life Safety Plan                                                    Page 3
  • Existing Building Plan & Demo Plan        Page 4
  • General Notes and ADA Info                       Page 5
  • ADA Info                                                                  Page 6
  • Floor Plan                                                                Page 7
  • Reflected Ceiling Plan                                     Page 8
  • Equipment Plan and Schedule                    Page 9
  • Elevations                                                               Page 10
  • Interior Elevations                                            Page 11
  • Floor Finish Plan and Schedule                  Page 12
  • HVAC Details                                                  Page 13
  • HVAC Floor Plans                                              Page 14
  • Hood Details - 1                                              Page 15
  • Hood Details - 2                                              Page 16
  • Hood Details - 3                                              Page 17
  • Plumbing Gen & Details                                 Page 18
  • Plumbing Supply Floor Plan                         Page 19
  • Plumbing Drainage Plan                                 Page 20
  • Plumbing Gas Supply                                        Page 21
  • Electrical Legends and Notes                      Page 22
  • Power Plan                                                             Page 23
  • Lighting Plan                                                         Page 24
  • Panel Schedules & Riser Diagram            Page 25

Interior Lighting COMcheck

Revision Set #1

This is the first set of revisions based on the comments from City of Greer

Kustom Krust Plan Review I.pdf     at: Kustom Krust Plan Review
2018-92.01 A-000-A-000 R1.pdf  at: Revised Cover Sheet                                Page 1 Revised
2018-92.01 A-111-A-111 R1.pdf  at: Revised Reflected Ceiling Plan          Page 8 Revised
2018-92.01 A-110-A-110 R1.pdf  at: Revised Floor Plan
2018-92.01 A-002-A-002 R1.pdf  at: Revised ADA Information                     Page 6 Revised
Interior Lighting COMcheck.pdf    at: Interior Lighting COMCheck

Walk-In Cooler Original Plans    Plan Link

This does not include the increase in size panels for the walk-in

Sign Plans Signage 2018-92.01 A-200-A-200 R1

 

Ready for Action?

LET'S GO!
Copyright 2024 IT Remote dot com
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram